First Floor System Started

Yesterday, TAB sent photos of the progress on our house. The concrete in the garage was poured and they've started framing the first floor. Once that is completed, an inspection is required, and the subfloor will be next.

Taken from the right front corner of the house; courtesy TAB Premium Built Homes

Taken from the left front corner of the lot. The garage is in the foreground; courtesy of TAB Premium Built Homes

Comments

Popular posts from this blog

Den Built-ins

Selecting the House Plan

Selecting an Interior Designer