Yesterday, our sister-in-law stopped by River House and took several photos. Since we left North Carolina last week, the electricians finished the rough-ins, the duct work for the heating and air conditioning systems is being installed and shingles are going on the roof.
|
All wires lead to the future location of the main electrical panel; courtesy of Dawn Jennings |
|
HVAC ducts in the floored attic space, which we decided to add heat and AC and drywall; courtesy Dawn Jennings |
|
Roof shingles going up; courtesy of Dawn Jennings |
Comments
Post a Comment