39.28% Complete

Friday was a big day at River House. Most of the doors and windows were installed; my sister-in-law visited and took a slew of photos, which I've posted over the last couple of days. And we learned over the weekend, the bank inspector also visited Friday and declared the house 39.28 percent complete.

The inspector’s report included several photos. While they will never win any photography awards, we saw a couple of things we had not seen before. This is the left side of the house. The doors go to the garage.

Left side of the house; courtesy of Trinity Inspection Service

This photo is of the master bathroom taken from the door to the closet. You can see the linen closet in the back right. The vanity will go in front of that closet along the right wall. In the left foreground is the shower. The half, or pony wall, is new and was not there in previous photos.

Master bath framing; courtesy of Trinity Inspection Service

Comments

Popular posts from this blog

We're in Debt Again

Selecting the House Plan

Selecting an Interior Designer